Tuesday, February 4, 2014

Paint, stain, scrape, paint, caulk....

Let's talk about the paint.  We have chosen beige - what a fabulous color!  It turns grey, brown, tan. Love it!  Trying to decide on the type of paint - eggshell or satin.  It's for the bathroom.  I tend to be a lover of flat paint because it doesn't show issues.  The sample we purchased - that I had to mix myself because the woman in the Big Blue L store was apparently unable / unwilling to mix it.  So I shook that little container of paint from Monett to Aurora.  Finally the bottom of the container was the paint color instead of white.  I know I could have waited until we got home - but where's the fun in that? The samples are only sold in satin and I kinda liked the look of it.  I didn't take pictures of it yet, sorry.  What I've read says to use satin in the bathroom because it cleans up better, is more scrubbable.

It's called
Lyndhurst Gallery Beige
2006-10B
Valspar  It really doesn't seem that dark in reality.

We will be putting wainscot up and it will be a shade of cream/white.  It looks like it matches the tile - so hopefully that's the outcome. 

I can't wait until we can get this room finished!!  It's so close - bet yet the list is sooooooooo long.

Snow Day!!! Sans snow....so far any way.

An update of progress.

We are still working on the main floor bathroom.  The tile is finished, grout finished, dry wall finished - all but last sanding, sink plumbed- installed - removed for final staining of mirror frame, over-toilet-cabinet installed (needs to be scraped and repainted), bathroom cabinet partially completed, paint color chosen.

Several weeks ago I went through and made a list of everything that needs completed on the main floor with the exception of the kitchen - 3 pages long - rather overwhelming.  Oh well.  I guess I wished I'd stayed in the dark and kept thinking oh we just have a few more things to do. Eh - what's done is done....and what isn't - isn't.

We do probably have a better attack plan at this point and way to stay more on track. That's a plus!

Here's my take on drywall.  Hanging it - great workout - especially for muscles you're not currently introduced to.  You also learn to use your head as a arm/hand appendage.  Great stuff.

First round of mud and tape - hate it!!!  Probably due to wanting it to look perfect instead of changing my mindset to - umm - put it on - you're going to sand it off and then it will look fine! 

Second round of mud - ok - I like this stage - rather artistic - you can see what it's going to be.

Third coat - walk away - don't touch it, quit messing with it.

Then it became rather addictive and I started mudding things that didn't need mudded because it made it look like PLASTER!!!!  Ahhhhhhhhhhhhhh - it's beautiful!!!!

Can't wait to get back to it so we can do the final sanding and paint.
Yeah!

Tuesday, October 1, 2013

Let the tiling begin...after the stud additions, leveling of this and that, and so on...

Yikes! There's lots to accomplish before you can add tile - including gaining knowledge and nerve.

First, studs had to be added because the PO didn't believe in 16" centers apparently.

Then we had to get them level - shimming, unshimming and so on.

And so this is how we finally got the tub to be level----shhhhhhhh - don't tell!


Love the Kerdi!  It really is a great project - but you have to be FAST!!!!!  We did wet down both the drywall and CBB, but it still dried quickly.


















Next, drywall, cement backer board - what??? drywall behind a shower - that's what Kerdi says - the orange water proof
membrane we installed - after putting up the drywall and cement backer board.


Here is the making of the story stick - so we could see where the tiles would lay out.


And this is another way to see how the tiles lay out - this is Chuck's preference so he can just SEE IT!!!  If you look closely there's our planned for niche - It was gonna be so cool!  We just felt we weren't at this leveling of tiling or Kerdi waterproofing to do this yet - maybe upstairs.
The installation of the bathroom exhaust fan.  Fun Stuff!
According to Schluter-Kerdi we could have put drywall behind all of it, but we had already purchased the CBB and so we decided to use some of each - mix it up a bit.

Then there was the stress of - do we put in a niche or do we not - after much "debate" over how to do it, we opted for no niche - you know they make some lovely shower organizers these days that will work just fine.  A niche would be nice - but not this time.

So the Kerdi is up - wait a week or 2 or .... maybe it was 4 or 5 and we finally decided tiling time had arrived!!  Woot Woot

It was a learning experience - but overall I think it turned out ok.  I do want to give a big thanks!!! to the humans on the John Bridge Tile Forum who helped get me headed in the right direction and feeling like I could do it and helping me figure out which thinset to use.
 
Putting up mosaic on mesh backing is not near as easy as they make it look on TV!!
 
 
I do really like these spacers!  Pretty easy to use and easy to remove - for the most part!

Sunday, September 29, 2013

Main Floor bath remodel continued...

Here is what vinyl flooring can do...



 







 

 

 And these are the 2 lovely ladies that keep us going on the remodeling projects!  We can't wait until you can come and stay with us.








 Will continue later...








BEFORE PICS Bathroom remodel in progress...

It's been a long time since I've updated.  Sorry.  I put in photos from all that as well.  On to the mainfloor bath remodel.

To date we have:
Installed new water lines, new toilet with all that goes with it, replaced the floor under the toilet and tub, pulled up all the vinyl tiles from the floor, took down all the plaster - then we decided the lath had to go to.  We have installed new drywall - both white and purple (blue) - it looks purple to me.  Let's take a look.

  We think there used to be a sink where it is a beige color.

 Ooooooooooweeeee GROSSNESS!  It's pulled and cleaned.  Would you like to purchase?

  Make sure your caulk is in good repair!

  See what I mean - who knows what all is growing there!

 Gone!

Sunday, April 21, 2013

Everything's turning up.....FLOWERS!

Just thought I'd post the variety of flowers at our house that have bloomed after being under cover for a VERY long time . . .

This wall paper is located in the first bedroom upstairs.  The bedroom has a door from the hallway and it has a closet.  It also has a door that goes into what we think is the master bedroom.  Our guess is that this room was a nursery.  What's anybody's thought about this that has some background knowledge for old homes.  I've searched the internet, but have not found a plan like this house.
This is my favorite - if I could find it I would consider putting it back up!

You can also see some of the more recent paper that was very cute that was for a nursery - little bears and pastel green.  However, we are not in need of a nursery - so the room shall probably just be a bedroom.  We've thought of various uses - haven't decided yet for sure.

Same room - it's what was a nursery - I'm not sure of the original purpose.
 
This wall paper is in the room that is directly located by the back stair case and is over the kitchen.  It has short walls with an opening into each side for storage.  On top of this is a baseball - green board painted looking wall paper and some aqua paint and some white paint in some places.
This is kinda pretty also - but I'm the only one with that opinion.
 This is located in what we think is the dining room.  It is under a layer of paint and I think another wall paper - but I haven't been able to get just paint off to reveal the top wall paper.  I'm sure this was very grand in its day!
Ummm - yeah - well there's this...

And now The Continuation.....

We left the BigBox - brick molding in hand - and a door sweep, and a new threshold at the proper width PLUS some of the frustration we brought in with us - we left it there - hopefully no one will decide to take it with them (it was kinda ugly!)

Arrived back to our lovely home with the new floor at the back door - put the old threshold back in for now, covered the door with the tar paper instead of the sweep - we now have 2 of these and called it a night, went to the DD's and family and spent the rest of the evening being entertained by the grand baby - she's such a welcome sight! Another plus? They have running water.  Sorry, I do miss that fabulous innovation!  Maybe next week????

Sunday morning...LET'S DO THIS!!!!! New day and everything is great!  Alright...so....storm door....look at nothing else - don't do it!  We put the brick molding in place on the outside of the door jam - well, that doesn't look to bad. 

I know - we need to restore this some day - but right now, stopping the rain from coming in is first and foremost! Look at that - we did get the hinge piece on the right direction, 1 for us despite the horrid directions - they even have diagrams - but  you still can't - without a doubt - tell which direction that piece goes.

Anyway, now, take the hinge piece back off after the pre-drilling to the door. We attached it to the brick molding - no problem. Time to attach the door to the hinge piece - OK, good.  Attach the other side - what? Wouldn't it be easier to cut out for the latch now?  No, OK...that's all the depth it needs? Alright....we'll see. 

Hey, the door closes - no problems, insert the little piece that goes in the latch hole - WOW! I can't believe that works - but it does! I'll take a pic later to show you. Crazy! OK - now for the top part of the door frame (door frame - really? OK - but it works).  Well, hmmm, yep, we made the decision to put brick molding there and then we will put some decorative wood piece or glass above it like a transom window down the road.   Alright - yep - this is going to work too!  Still, something is going to go a miss, isn't it? 

Continuing on - the brick molding is in place above the door, attach the rest of the door frame to it - still closes perfectly.  *wipe sweat from brow.  We decided to use some of our older, weathered plywood for now for the missing 8 inches above the door.  Ya know, that door looked regular height - I guess when things are always so far above you, you tend to not notice how far above you - this door actually should've been 88" - so that will be something we put on our search for list in the restoration category.  Any thoughts anyone? 

So - continuing on - DH caulked the door, trim, transom area, etc. I'm really wanting to become skilled with the caulk gun - maybe someday...sigh 

Scaper looks like this...have you seen it?
A little more scraping needed - rut roe (love Scooby Doo, don't you - always that right response at times like this) Small Project turned into Taking Up Our Whole Weekend Project. So - no problem - even though it is Chuck's favorite scraper / do anything tool and now mine, as well.  Chuck has a cow magnet on a string that will fish this puppy right outta there - next time we come!  Don't worry scraper, we'll get you out!
DH accidentally loses grip on the scraper, listen... - "ting" - now it's under the breakfast room - it fell between the very small opening between the steps and the breakfast room / used to be porch - so yeah - there's this opening that was covered up with by a wooden step that was also removed at the beginning of this
At the time of the falling - the floor was completely recovered with new wood. Scraper fell between the board and concrete on the right side - really???

Next, we(read Chuck) must attach the storm door closers (yes - that is the proper term - who knew - just looked it up) to the door.  I will learn how to use these power tools - but this is not a first project for a beginner. I did; however, help screw a board into place yesterday! 

Attaching the closers was a tad difficult with the gale force wind coming through the kitchen - as another blogger had mentioned - architects back in the day did know how to design a house with proper ventilation and natural cooling - what a wonderful breeze comes through the house.  Shutting the door into the kitchen quickly solved this problem and we are back on track. 

Hey - there's the new lock on the back door!
 
Closers on, time to finish putting the trim on the trim (not a typo - there's trim for the trim) so it looks seamless.  DH says - here's this piece that goes on the bottom - ummmmm - clearly I need to be the one that reads the directions so we follow the sequence. Definitely an anecdote to share with 6th graders on how you will use sequence of events in your life! LOL Unscrew the frame again - still not going on - you know what? It looks fine without that doesn't it? Yep. 

Next? UGH - there's one for the other side too and if we don't add it - that's going to catch pant legs, legs, etc.  Well - what's the deal?  This one slid right up there!  Sooooooo - I guess - like that silver thing under the radiator - I'll work on this another time - by myself - it'll go on.  We step back, admire our work and agree - we are not looking at anything else - the electric and plumbing must be first and foremost now!!!!

 
 
 


The plan for our next work weekend: replacement of knob-and-tube wiring - which has been the plan for Day 1, from Day 1 - but - truly when you have water coming in from everywhere - that does need fixed first!

The next post will be about snipping and pulling. Hmmmmmmm...................